The old Location behind Coast Shelter ceased operation on Monday 5th September.
This week we have had all hands to the pump, collecting materials to begin the interior fitout.
We have to construct the Office, Meeting Room/Kitchen/ Toilets, Shower, Wash Basins and a Tool Storeroom.
We will be back tomorrow and Friday batting on. Although we do not have the Power connected yet due to a Funding Shortfall, we will make the most of what we have, taking small steps we will eventually get over the line.
Thank you to Larry, Peter J, Doug S, Paul, Frank, Tony and Dick for the extra effort that you have put in this week and to those who rolled up today to help.
It is great to see the enthuiasm from Members to assist in Building Your Shed.